Skip to product information
1 of 5

Novarehouse

Golden S-Curve Floor Vase Striped Resin

Golden S-Curve Floor Vase Striped Resin

Regular price $85.99 USD
Regular price $0.00 USD Sale price $85.99 USD
Sale Sold out
Shipping calculated at checkout.
Color
Size
Quantity

🌿 Golden S-Curve Floor Vase — 24", Striped Resin, Flat-Back, Shatter-Resistant

A sculptural statement piece that commands attention without demanding space. This 24-inch resin floor vase features a graceful S-curve silhouette with refined vertical striping, a weighted flat-back base for stability, and a thoughtfully sized oval opening perfect for pampas grass, dried botanicals, branches, feathers, or reeds.

  • Sculptural S-Curve Design — Graceful curved profile with vertical striping transforms this vase into a dynamic sculpture. Infuses any room with modern luxury and artistic flair.
  • Ideal Proportions — 24" (60 cm) tall with a space-savvy flat-back profile. Perfect for corners, stair landings, narrow hallways, and entryways without obstruction.
  • Oval Opening for Easy Styling — 4"L × 3.1"W opening is sized for effortless arrangement of pampas grass, architectural branches, feathers, and reeds.
  • Shatter-Resistant Resin — High-density resin construction resists chips, cracks, and shatters. Handles everyday bumps with ease — ideal for active homes and elegant offices alike.
  • Substantial & Premium Feel — Weighs 6.6 lbs (3 kg) for a quality, grounded presence. Weighted flat base ensures the vase stands firm and stable.
  • Effortless Maintenance — Non-porous surface resists stains. A quick wipe with a damp cloth keeps it looking freshly displayed.
View full details